Nor-Lake Capsule Pak Walk-In Cooler Installation
The process of installing a Nor-Lake Capsule Pak walk-in cooler needs to be taken one step at a time, with the proper precautions taken to make it as safe and accurate as possible. Before the installation takes place, be sure to read all included directions and follow closely, and if needed, utilize the aid of a certified electrician and authorized refrigeration installer.
The installation videos provided by out friends at Nor-Lake cover directions for both the Walk-In & One-Piece Capsule Pak, and the Walk-In & Two-Piece Capsule Pak.
Before beginning on the installation, gather the recommended tools and materials like:
- Safety goggles
- Pry bar
- Hammer
- 2 adjustable open-end wrenches
- Drill driver
- Pencil
Nor-Lake Walk-In & One-Piece Capsule Pak Installation
Nor-Lake Walk-In & Two-Piece Capsule Pak Installation
For more installation and part information, take a look through our collection of Nor-Lake manuals and diagrams.